General Information

The valve and plumbing kit can be installed on a tractor using tools ordinarily available. The valve control handle has been factory preassembled for ease of installation.

Before installation, shut off the tractor engine, engage the tractor brakes, and completely lower the three-point hitch.

Assembly Instructions

Fasten the valve to the valve mounting plate using cap screws and lock washers. Attach the decal mounting plate to the valve using cap screws and lock washers.

Install the valve and plumbing kit according to the instructions, ensuring that all connections are secure and tightened properly.

Warning

Escaping hydraulic fluid under pressure can penetrate skin, causing serious injury. Install plastic plugs into the end of tubes and do not use hands to check for leaks.

Manual:

Download: VALVE AND PLUMBING KIT 2408TL LOADER ASSEMBLY MANUAL

Chat: Powered By VoiceSphere

Related Posts
No Thoughts on VALVE AND PLUMBING KIT 2408TL LOADER ASSEMBLY MANUAL