Introduction
This manual provides installation instructions for the Mobile Link Adapter, which permits installation of the Mobile Link Unit to 2010 and later liquid-cooled gaseous fueled Home Standby (HSB) generators.
Important Safety Information
The manufacturer recommends that the operator read and thoroughly understand the instructions and contents of this manual before attempting to use the equipment.
WARNING: This product contains or emits chemicals known to the state of California to cause cancer, birth defects, and other reproductive harm.
Installation Overview
The installation process involves switching the generator to OFF, removing fuses and cables, drilling a mounting hole, and installing the Mobile Link Unit using the new liquid-cooled harness.
Refer to the Mobile Link Owner’s Manual for complete installation procedures.
Manual:
Download: Installation Manual for Mobile Link Adapter for Liquid-cooled Generators
Chat: Powered By VoiceSphere