Set Loading and Unloading Instructions
The BD Alaris Pump Module requires proper loading and unloading procedures to ensure safe and accurate fluid delivery. The process involves loading the upper fitment, verifying the tubing placement, and ensuring the pump module door is closed properly.
Key steps include:
* Loading the upper fitment by dropping it from the top and ensuring it fits loosely in the recess
* Verifying the tubing is not twisted and press the blue safety clamp fitment into the blue recess
* Firmly pushing the tubing towards the back of the air-in-line detector
* Gently closing the module door and verifying no fluid is flowing through the drip chamber
Important Safety Precautions
To avoid potential hazards, ensure the following cautions are followed:
* Use only BD Alaris Pump Infusion administration sets
* Do not touch the administration set while closing the door
* Ensure the tubing placement is over pressure sensors
* Ensure the upper fitment is not elevated above the receptacle on the pump
* Prevent a free-flow condition by ensuring the pump module door is closed properly and no extraneous objects are enclosed
* Verify the device is close to the patient’s heart level and the administration set is free from kinks and correctly installed
Manual:
Download: Set loading and unloading guide for the BD Alaris Pump Module BD Alaris System User Manual
Chat: Powered By VoiceSphere