Assembly and Installation Instructions
These instructions provide a step-by-step guide for installing the RAM Promaster City No-Drill Shelving Mounting Kit. The kit comes with various parts, including 36″ wide or 42″ wide rear shelving units, mounting feet, and blind fasteners.
PreInstallation Checklist
Beware of potential hazards while installing the shelving kit. Wear protective eyewear to avoid debris and electrical wiring issues. Ensure the van is clean and free of obstructions.
Installation Steps
The installation process consists of three main steps:
- Step 1: Remove tie-down hooks and determine which shelving unit to install (36″ wide or 42″ wide).
- Step 2: Install mounting feet, ensuring they are securely attached to the van floor.
- Step 3: Install blind fasteners in existing holes on the rear pillar and side wall of the van, ensuring proper sealing and avoiding damage to critical vehicle systems.
Follow the manufacturer’s instructions and take necessary precautions to ensure successful installation and avoid potential issues.
Manual:
Chat: Powered By VoiceSphere